Training Details
Title: Advance Warning (Flashing) Arrow Panels: Positive Guidance
Description: This program describes correct use of flashing and sequential arrow panel signs to indicate lane closure for highway construction work zones. Stationary and moving installations are shown. The video discusses mode selections (arrow, chevron, or caution; flashing or sequential), panel design standards for given traffic speeds and volumes, lamp brightness, sign height, and power supply. Applications and placement in conjunction with other traffic control devices are shown for single and multiple lane closures, center-lane work areas, and shoulder closures. Costs and maintenance are discussed, and the program's recommendations are summarized.
Publisher: Federal Highway Administration
Length: 25 min.
Website: http://www.techtransfer.berkeley.edu/videos/mcdisplay.php?call_number=VH-608
Contact:
University of California at Berkeley
177 RFS, Rm 13
Berkeley, California 94720-1720
Phone: (510) 665-3624
Email: czoneinfo@techtransfer.berkeley.edu